News Flash

Posted on: March 5, 2019

Week of 2/18/19

Due to the muddy conditions on the site, the contractor was limited to working mainly from the paved surface.  However, they were able to plant all of the street trees as well as place seed and straw in the area between the curb and sidewalk.

Read on...

West Main Extension
Posted on: March 1, 2019

Week of 2/11/19

Despite the wet weather lately, the contractor was able to work from the paved surface and begin the landscaping along the street.  The area between the sidewalk and curb was topsoiled and seeded, and the street trees were planted.  A to...

Read on...

West Main Extension
Posted on: February 12, 2019

Week of 2/4/19

While the poles are installed and wired in, our Energy Services Department is still in the process of bringing power onto the site, so we'll have to wait a little longer to test them out.

Read on...

West Main Extension