Section 175-69        LOT COVERAGE.

A.  Maximum building coverage: - fifty percent (50%).

 

B.  Maximum impervious surface coverage: - seventy-five percent (75%).



(Ord. No. Z-2-95 Added Entire Section 1-23-95-Effective Upon Passage)